PDC Consent Fee Calculator
Estimate PDC consent fees for the sale or subletting of industrial properties on PDC land in Penang.
Compare up to three scenarios based on transaction type, Penang Island or Mainland location, owner operating status, land area for a sale, or rental value and tenancy period for a sub-let.
Use this calculator for preliminary planning. Confirm the applicable consent requirements and fee with PDC for the specific property and transaction.
PDC Consent Fee Analysis
Item
Scenario A
Scenario B
Scenario C
1. Property & Transaction Details
Property / Reference
Transaction Type
Location
Owner Status
Land Area
(Sale / Sub-sale only)
Monthly Rental (RM)
(Rent / Sub-let only)
Tenancy Period
(Years · Rent / Sub-let only)
Total Contract Value
(Monthly Rental × 12 × Years)
-
-
-
2. Estimated PDC Consent Fee
Calculation Basis
RM5 / sq ft
RM5 / sq ft
RM5 / sq ft
ESTIMATED PDC CONSENT FEE
RM 0.00
RM 0.00
RM 0.00
Calculation Basis
Sale / Sub-sale
Operating Owner: Mainland RM5 psf; Penang Island RM10 psf.
Non-Operating Owner: Mainland RM10 psf; Penang Island RM20 psf.
Consent Fee = Land Area (sq ft) × applicable rate.
Operating Owner: Mainland RM5 psf; Penang Island RM10 psf.
Non-Operating Owner: Mainland RM10 psf; Penang Island RM20 psf.
Consent Fee = Land Area (sq ft) × applicable rate.
Rent / Sub-let
Operating Owner: 5% of Total Contract Value.
Non-Operating Owner: 10% of Total Contract Value.
Total Contract Value = Monthly Rental × 12 × Tenancy Period (Years).
Operating Owner: 5% of Total Contract Value.
Non-Operating Owner: 10% of Total Contract Value.
Total Contract Value = Monthly Rental × 12 × Tenancy Period (Years).
General Disclaimer:
This calculator is provided for preliminary estimation and planning purposes only.
PDC requirements, consent rates and transaction-specific conditions may change or
differ according to the applicable property, title, lease and proposed transaction.
The results do not constitute official legal, financial or professional advice.
Verify the applicable consent requirements and fees with the Penang Development
Corporation (PDC) and your appointed professional advisers before relying on the
estimate for a transaction.
TOTAL A
RM 0
TOTAL B
RM 0
TOTAL C
RM 0
Prepared by PenangIndustrial.com
PDC Consent Fee Analysis · Preliminary estimate only